Back to Writing Hub

User-written IELTS example

Writing Academic Task 1 Band 9.0 Example

Original task prompt, user essay, band score, and related examples in the same report workspace.

182 words AcademicTask 1Map
Task 1

Illustrative target band for this original model answer.

Plan your answer

Try your own response before reading the samples.

Ideas to explore

  • Group replaced facilities separately from retained features.
  • Use compass directions and avoid assumptions about visitor behaviour.
  • Keep the description within the information supplied by the task.

Suggested structure

  1. Introduce the two layouts.
  2. Summarise replacements and retained features.
  3. Describe the earlier arrangement.
  4. Explain the changes by location.
Useful vocabulary & examples
percentage points
the absolute difference between two percentages

A change from 40% to 35% is a fall of five percentage points.

remain unchanged
stay at the same value or position

The administration share remained unchanged.

be replaced by
be removed and have another feature put in the same place

The car park was replaced by a playground.

Answer analysis

Task Achievement

Reports all specified changes and stable features with accurate spatial references.

Organisation

Separates the initial layout from later replacements, while the overview summarises both change and continuity.

Task Prompt

The maps show changes to Riverside Park between 2010 and 2025. 2010: an entrance on the south side; a central lawn; a car park in the west; tennis courts in the east; a pond in the north. 2025: the southern entrance and central lawn remain; the western car park is replaced by a playground; the eastern tennis courts are replaced by a cafe; the northern pond remains; a footpath is added around the lawn. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.
IELTS Writing Task 1 visual

User Essay Analysis

Review the public answer with report-style highlights.

Band 9.0

The maps compare the layout of Riverside Park in 2010 and 2025, showing changes to its facilities while retaining several original features.

Overall, the park gained a playground, a cafe and a footpath. These changes replaced the car park and tennis courts, whereas the entrance, central lawn and northern pond remained in their original positions.

In 2010, visitors entered from the south, with the lawn occupying the centre of the park. A car park lay to the west of the lawn, while tennis courts were situated on the eastern side. The pond was located in the north. The layout therefore placed the principal facilities on either side of the central open space.

By 2025, the western car park had been removed and a playground established in its place. On the opposite side, a cafe had replaced the tennis courts. A footpath was also added around the lawn, although the lawn itself was retained. The southern entrance and northern pond were unchanged. The maps indicate alterations to the site’s facilities, but do not specify how visitors’ numbers or activities changed over the period.

Targeted Improvement Tips

1
The playground replaces the western car park and the cafe replaces eastern tennis courts. The entrance, lawn and pond remain, with a path added around the lawn. Do not infer why the changes were made.
2
Use an overview and group details by the actual comparison rather than describe every label in turn.
3
Check the quoted revisions and retain precise figures, dates, locations and tone.